UPDATE 2: Demo
Out With The Old
This Attic transformation is underway! It took about a week to demo this Minneapolis Attic. The wall materials and insulation were removed, exposing the framing. In the existing Bath, we disposed of the tile, fixtures, cabinets, tub, and countertops. We removed the old Bath skylights and filled the gaps to match the rest of the roof. The Attic’s remaining windows were also removed, and the openings covered with plywood until it’s time to install new windows.







