Footings

The new garage/ADU will be supported by frost footings. The footings guard against settling and slippage that can damage the new structure. They also keep posts and beams from direct contact with the earth. Going below the frost line helps prevent soil movement due to frost called “frost heave”.

The frost footings have been poured. By code footings are required to be between 54 and 60 inches deep. We also dug the utility trench and ran the plumbing from the main house to the new structure.
We connected the plumbing from the main home's basement through the yard trench to the new Garage/ADU so the unfinished interior space above the garage can be finished into an apartment at a later date.
Once the plumbing is connected to the new structure, we repair the basement floor.
A crew lays the CMU (also known as block).

Backfill

Clean fill is brought in for backfill and to prep for the new slab. Sand helps the new Garage concrete slab in a couple of ways. First, it creates a good drainage plane over our sub-soil/existing soil, and it also aids in creating a level surface for the new slab. We’re replacing the excavated soil because it contains roots and stones that would prevent it from compacting, which could create voids and sinkholes, leading to foundation erosion. The soil removed at excavation is taken away and repurposed or used in re-grading the yard as needed.

 

The new slab is poured.
Here's a close up of the plumbing tied in from the main house above the slab.

Up Next…

Take a look at framing the Garage/ADU structure.

PREVIOUS UPDATE

Demo & Excavation

NEXT UPDATE:

Framing