Every White Crane Remodeling Project Starts With Design
Learn why having both designers and construction professionals on our team allows us to guide clients seamlessly through the entire remodeling process.
See inside as we transform the kitchen and upper level bath of this 1920s Tangletown home.
We’re heading to the finish line of this Tangletown kitchen and bath remodel by installing appliances and fixtures from the stovetop to bathroom faucets. Appliance and fixture installation is a significant step toward project completion, with multiple crews coming to finalize work started during the rough-in phase. Selections made early in the design process are now being fully realized, as handmade pendants and the free standing tub ornament newly revitalized spaces. Our design team worked with the Tangletown homeowners to find the proper selections for their Colonial home to achieve a balanced and beautiful interior.
Here are a few selections from the kitchen:
Beyond the kitchen, we also worked on installing fixtures like sconces and faucets in the primary bath upstairs. Designs for this calming bathroom retreat called for a mix of timeless yet enchantedly bold selections. Plumbers worked on getting these selections installed and the necessary water lines connected to toilets, the shower and tub fixtures, and the double-sink faucets. See our video of the plumber finishing up connections and faucet mounting for the free standing tub. Meanwhile, the electricians mounted decorative fixtures as final measures for venting/exhaust were completed.
Here are some relevant bathroom selections:
We’re here to help! Check out our planning resources below, or reach out to us here.